Description of Work: Existing system configuration analysis, design, & installation of sedimentation ponds to control sediment for golf course irrigation system. Design build by WHCE, with excavation of two successive sediment traps with diversion and control structures. Dewatering and removal of sediment from existing irrigation water regulating reservoir. Scope increased to redevelop diversion from the Colorado River and reconfigure transfer pumping configuration.