Description of Work: Multiple phased projects. Designed and relocated 50+ horsepower pump station and pumping structures, including connections and extension to existing infrastructure. Designed new pipe alignment and corridor for multiple utilities, including parallel 18” HDPE manifold pipes and 8” Irrigation pipe. Very congested utility corridor with more than 15 utility crossings per 1000 feet. Designed new pipeline alignments, both 10-inch and 6-inch, and connected to existing pipelines. Designed new low-head diversion and screen. Services included site investigations, sprinkler application design, coordination with surveyor and excavation contractor, plans and specifications for relocation of pump station, issuance of construction documents, and construction services. Application design was for approximately four acres of turf and landscape.